PIPELINES

The power generation facility will be fueled by sweet natural gas.

A new 30 km (approximate) pipeline will transport the natural gas from the NGTL Windfall Meter Station to the power generation facility.

Preliminary pipeline outside diameters:

  • Natural Gas Pipeline = 12 inches
  • CO2 Pipeline = 10 inches

The pipelines will be regulated by the Alberta Energy Regulator.

Right-of-way of an existing pipeline in the area
Map showing the preferred routes for both the natural gas pipeline and the CO2 pipeline

APPLICABLE LEGISLATION

  • Migratory Bird Convention Act
  • Fisheries Act
  • Species At Risk Act
  • Pipelines Act
  • Oil and Gas Conservation Act
  • Alberta Public Lands Act
  • Alberta Water Act
  • Historical Resources Act